Colorado Department of Transportation road work report | VailDaily.com
YOUR AD HERE »

Colorado Department of Transportation road work report

VAIL, Colorado “-I 70 Eastbound/Westbound Business Between F Road (Patterson) and 32 Road in Grand Junction (Milemarker 25) (through November 2008)

7:00am-5:00pm MO-FR Traffic slowing and minor delays for intersection improvements at Peachtree Shopping Center. At least two accesses to the shopping center will be kept open during construction.



I 70 Eastbound/Westbound Between Palisade and Grand Mesa Exit (CO 65) (Milemarker 43-50) (through October 2008) 6:00am-5:00pm MO and FR, 6:00am-7:00pm TU, 6:00am-6:00pm WE-TH Single lane closures for striping operations. A 12 ft. width restriction is in effect during work hours. Delays are possible.



I 70 Eastbound/Westbound Through the No Name Tunnels in Glenwood Canyon (Milemarker 117-119) (through October 2008) 24 Hours Only one lane open in each direction for tunnel rehabilitation. Delays are possible. 14 ft. width restriction, height restriction of 16 ft. 6 in., speed limit reduced to 35 mph through the work zone.

I 70 Eastbound/Westbound Through Glenwood Canyon (Milemarker 118-131) (through October 2008) 6:00am-8:00pm SU-SA Single lane closures for center-line longitudinal joint sealing. Up to 15 minute delays expected depending upon traffic volumes.



I 70 Eastbound/Westbound at the Minturn Exit (Milemarker 171) (through October 2008) 5:00am-3:30pm MO-FR Right lane closure for shoulder work. Possible weekend work. Delays possible.

I 70 Eastbound/Westbound Between Vail Pass and East Vail (Milemarker 180-190) (through November 2008) 8:00am-4:00pm MO-FR Right lane closure for pull box installation and asphalt patching. Delays are possible. 24 Hours MO-SA Right lane closures for bridge expansion joint work and paving. Delays expected. 12 ft. width

restriction.

I 70 Eastbound/Westbound Eisenhower Tunnel to Silverthorne Interchange (Milemarker 206-213) (through October 2008) 7:00am-6:00pm MO-TH Single lane closures for guardrail work, striping, and shoulder and curb repairs. Delays possible.

I 70 Eastbound/Westbound through the Eisenhower Johnson Memorial Tunnels (Milemarker 213-216) (through November 2008) 6:00pm-6:00am SU-SA Single lane closures in both directions for routine maintenance. Delays are possible. 8:00pm-6:00am MO-TH, 10:00pm-6:00am SU and FR Single lane closure on eastbound for panel installation and guardrail removal. Delays possible. 24 hour lane closure beginning 7:00am TU through 7:00am WE.


Support Local Journalism


Start a dialogue, stay on topic and be civil.
If you don't follow the rules, your comment may be deleted.

User Legend: iconModerator iconTrusted User