Road Conditions | VailDaily.com

Road Conditions


List View Grid View
  • Road
    Conditions
    Updated
    Hazard
    Alert
  • Rifle -Glenwood Springs
    Dry
    2 hours ago
    No
    ROAD ALERT: West: I-70 in New Castle
    Road Work
    MM105.65
    MM105.65
    I-70 Westbound I-70 in New Castle (Milemarker 105.65-105.65) (through July 2018)
    VMS replacement
    ROAD ALERT: East: New Castle, CO
    Road Work
    MM105
    MM106
    I-70 Eastbound New Castle, CO (Milemarker 105-106) (through August 2018)
    VMS replacement
    ROAD ALERT: East: New Castle, CO
    Road Work
    MM109
    MM110
    I-70 Eastbound / Westbound New Castle, CO (Milemarker 109-110) (through October 2018)
    Guardrail repair
    ROAD ALERT: East: 1 Mile E. of Glenwood
    Road Work
    MM97
    MM116
    I-70 Eastbound / Westbound 1 Mile E. of Glenwood (Milemarker 97-116) (through October 2018)
    Chip sealing
    ROAD ALERT: East: bridge between downtown Glenwood Springs, the Historic Hot Springs District, and I-70
    Road Work
    MM116
    MM116
    I-70 Eastbound / Westbound Grand Ave. Bridge bridge between downtown Glenwood Springs, the Historic Hot Springs District, and I-70 (Milemarker 116-116) (through June 2018)
    This is a 30-month construction project building a new Grand Avenue Bridge and Pedestrian Bridge
    ROAD ALERT: East: I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County
    Road Work
    MM116
    MM132
    I-70 Eastbound / Westbound I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County (Milemarker 116-132) (through September 2019)
    The project will consist of: • installing three weather stations for live monitoring and reporting of weather conditions; • installing 73 standard static signs; • installing 17 new dual, variable speed limit signs; • replacing five single variable speed limit signs; • removing 38 existing static signs; • installing nine closed-circuit cameras for live monitoring and viewing of roadway conditions; • adding other surface and subsurface conduit, and related improvements to guide the display of the variable speed limits. This section of I-70 experiences a range of weather conditions throughout the year, causing unsafe conditions for drivers who don't take proper precautions. The new signs will: • give drivers advance warning and generate a safer traffic flow to decrease accidents in the canyon. • increase the standard speed limit during good conditions to 60 mph compared to 50 mph in most areas of the canyon. • lower the speed limit to assist with incident management, conditions created by inclement weather, and maintenance and construction.
    ROAD ALERT: East: Along I70 in Glenwood Canyon, Garfield and Eagle Counties
    Road Work
    MM116
    MM133
    I-70 Eastbound / Westbound Along I70 in Glenwood Canyon, Garfield and Eagle Counties (Milemarker 116-133) (through June 2018)
    The work consists of 15 Miles of surface treatments along I-70 including the removal of 2” asphalt and replacement with throughout the canyon. Additionally, bridge connections repairs are planned at MP 123.
  • Glenwood Springs-Eagle
    Dry
    2 hours ago
    No
    ROAD ALERT: East: East of Glenwood Springs by the Hanging Lake Tunnel
    Road Work
    MM122
    MM125
    I-70 Eastbound / Westbound East of Glenwood Springs by the Hanging Lake Tunnel (Milemarker 122-125) (through August 2018)
    Construction will include the removal of six existing flex post fences and replacing them with higher capacity rockfall fences.  Construction of the new rockfall barriers will take place prior to removing the old damaged rockfall barriers.  The improved and higher capacity rockfall fences will help to further mitigate the potential for rockfalls in the canyon
    ROAD ALERT: East: at Hanging Lake Tunnel east of Glenwood Springs
    Road Work
    MM125
    MM126
    I-70 Eastbound at Hanging Lake Tunnel east of Glenwood Springs (Milemarker 125-126) (through November 2018)
    Sign replacement on I-70 at Hanging Lake Tunnels
    ROAD ALERT: East: Glenwood Canyon
    Road Work
    MM129
    MM130
    I-70 Eastbound / Westbound Glenwood Canyon (Milemarker 129-130) (through October 2018)
    Chip seal
    ROAD ALERT: East: I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County
    Road Work
    MM116
    MM132
    I-70 Eastbound / Westbound I-70 east of Glenwood Springs in the Glenwood Canyon corridor, Garfield and Eagle County (Milemarker 116-132) (through September 2019)
    The project will consist of: • installing three weather stations for live monitoring and reporting of weather conditions; • installing 73 standard static signs; • installing 17 new dual, variable speed limit signs; • replacing five single variable speed limit signs; • removing 38 existing static signs; • installing nine closed-circuit cameras for live monitoring and viewing of roadway conditions; • adding other surface and subsurface conduit, and related improvements to guide the display of the variable speed limits. This section of I-70 experiences a range of weather conditions throughout the year, causing unsafe conditions for drivers who don't take proper precautions. The new signs will: • give drivers advance warning and generate a safer traffic flow to decrease accidents in the canyon. • increase the standard speed limit during good conditions to 60 mph compared to 50 mph in most areas of the canyon. • lower the speed limit to assist with incident management, conditions created by inclement weather, and maintenance and construction.
    ROAD ALERT: East: Along I70 in Glenwood Canyon, Garfield and Eagle Counties
    Road Work
    MM116
    MM133
    I-70 Eastbound / Westbound Along I70 in Glenwood Canyon, Garfield and Eagle Counties (Milemarker 116-133) (through June 2018)
    The work consists of 15 Miles of surface treatments along I-70 including the removal of 2” asphalt and replacement with throughout the canyon. Additionally, bridge connections repairs are planned at MP 123.
    ROAD ALERT: West: 2 miles east of Glenwood Springs
    Seasonal Closure
    MM119
    MM130.7
    I-70 Westbound / Eastbound 2 miles east of Glenwood Springs (Milemarker 119-130.7)
    Glenwood Canyon bike path closed for season
  • Eagle-Vail
    Dry
    2 hours ago
    No
    ROAD ALERT: East: Bridge (F-10-L) between Wolcott and Edwards
    Road Work
    MM158.05
    MM158.85
    I-70 Eastbound / Westbound Bridge (F-10-L) between Wolcott and Edwards (Milemarker 158.05-158.85) (through August 2018)
    The Eagle County (F-10-L) bridge repair is a 5 1/2-month long project effecting east and westbound I-70 at MP 158.05-158.85. The project location is between Wolcott and Edwards.This project includes bridge deck repair, steel girder replacement and expansion joint replacement. Construction begins in the area on Monday, Mar. 26, 2018.
  • Vail-Vail Pass
    Dry
    2 hours ago
    No
    ROAD ALERT: West: East Vail
    Road Work
    MM182
    MM182
    I-70 Westbound / Eastbound East Vail (Milemarker 182-182) (through July 2018)
    Water Quality Improvements
  • Vail Pass-Copper Mtn
    Dry
    2 hours ago
    No
    ROAD ALERT: East: I-70 East Side of Vail Pass MP 190-197.5
    Road Work
    MM190
    MM197.5
    I-70 Eastbound / Westbound I-70 East Side of Vail Pass MP 190-197.5 (Milemarker 190-197.5) (through October 2018)
    Asphalt mill and overlay operations
    ROAD ALERT: East: I-70 for 7.5 miles, from Vail Pass to Officers Gulch
    Road Work
    MM190
    MM197.5
    I-70 Eastbound / Westbound I-70 for 7.5 miles, from Vail Pass to Officers Gulch (Milemarker 190-197.5) (through October 2018)
    The project is located in between Vail Pass and Officers Gulch in Summit County, Colorado. Its focus areas include Colorado Highway 9 and US 6 near the interchange of Interstate 70. This is an infrastructure highway maintenance project. This project is meant to improve the safety and maneuverability of the highway by repaving approximately 7.5 miles of roadway. I-70 will undergo asphalt mill and overlay operations.
  • Copper Mtn-Silverthorne
    Dry
    2 hours ago
    No
    ROAD ALERT: East: I-70 East Side of Vail Pass MP 190-197.5
    Road Work
    MM190
    MM197.5
    I-70 Eastbound / Westbound I-70 East Side of Vail Pass MP 190-197.5 (Milemarker 190-197.5) (through October 2018)
    Asphalt mill and overlay operations
    ROAD ALERT: East: I-70 for 7.5 miles, from Vail Pass to Officers Gulch
    Road Work
    MM190
    MM197.5
    I-70 Eastbound / Westbound I-70 for 7.5 miles, from Vail Pass to Officers Gulch (Milemarker 190-197.5) (through October 2018)
    The project is located in between Vail Pass and Officers Gulch in Summit County, Colorado. Its focus areas include Colorado Highway 9 and US 6 near the interchange of Interstate 70. This is an infrastructure highway maintenance project. This project is meant to improve the safety and maneuverability of the highway by repaving approximately 7.5 miles of roadway. I-70 will undergo asphalt mill and overlay operations.
  • Silverthorne-Eisenhower/Johnson tunnels
    Dry
    2 hours ago
    No
    ROAD ALERT: East: Eisenhower-Johnson Memorial Tunnel South Bore
    Road Work
    MM215
    MM211
    I-70 Eastbound Eisenhower-Johnson Memorial Tunnel South Bore (Milemarker 215-211) (through November 2017)
    Work to repair barrier rail, walkway and handrail repairs
    ROAD ALERT: East: I-70 Eastbound ramp to southbound I-25
    Road Work
    MM213
    MM213
    I-70 Eastbound I-70 Eastbound ramp to southbound I-25 (Milemarker 213-213) (through October 2018)
    Concrete joint repair
    ROAD ALERT: East: I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path)
    Road Work
    MM213
    MM213.5
    I-70 Eastbound / Westbound I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path) (Milemarker 213-213.5) (through October 2018)
    Crews will install avalanche-control measures at: Loop Road slide path the above the Eisenhower/Johnson Memorial Tunnels; Batch Plant & Whistler slide paths west of EJMT on I-70; (north side); and Eighty slide path near Berthoud Pass on US 40.
    ROAD ALERT: North: in Denver Metro Area
    Road Work
    MM213
    MM260
    I-70 Northbound / Southbound in Denver Metro Area (Milemarker 213-260) (through June 2018)
    Install pavement markings on various highways regionwide
    ROAD ALERT: East: Near Granby
    Road Work
    MM219
    MM212
    US 40 Eastbound / Westbound Near Granby (Milemarker 219-212) (through September 2018)
    Machine Patching
  • Eisenhower/Johnson tunnels-Georgetown
    Dry
    2 hours ago
    No
    ROAD ALERT: East: Eisenhower-Johnson Memorial Tunnel South Bore
    Road Work
    MM215
    MM211
    I-70 Eastbound Eisenhower-Johnson Memorial Tunnel South Bore (Milemarker 215-211) (through November 2017)
    Work to repair barrier rail, walkway and handrail repairs
    ROAD ALERT: North: I-25 north of 104th Ave
    Road Work
    MM221
    MM221
    I-70 Northbound I-25 north of 104th Ave (Milemarker 221-221) (through August 2018)
    Bridge repairs on pedestrian bridge
    ROAD ALERT: West: I-70 and Bakerville
    Road Work
    MM222.5
    MM223.2
    I-70 Westbound I-70 and Bakerville (Milemarker 222.5-223.2) (through July 2018)
    VMS replacement
    ROAD ALERT: East: on I-70 from Eisenhower Memorial Tunnel to Silver Plume
    Road Work
    MM218
    MM226
    I-70 Eastbound / Westbound on I-70 from Eisenhower Memorial Tunnel to Silver Plume (Milemarker 218-226) (through June 2018)
    crack sealing
    ROAD ALERT: East: Between Glenwood Springs and New Castle
    Road Work
    MM221
    MM227
    I-70 Eastbound / Westbound Between Glenwood Springs and New Castle (Milemarker 221-227) (through December 2018)
    Bridge inspection
    ROAD ALERT: West: WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs
    Road Work
    MM216
    MM237
    I-70 Westbound / Eastbound WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs (Milemarker 216-237) (through September 2018)
    Sand clean up and guardrail repairs
    ROAD ALERT: East: Near Granby
    Road Work
    MM219
    MM212
    US 40 Eastbound / Westbound Near Granby (Milemarker 219-212) (through September 2018)
    Machine Patching
  • Georgetown-Idaho Springs
    Dry
    2 hours ago
    No
    ROAD ALERT: West: WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs
    Road Work
    MM216
    MM237
    I-70 Westbound / Eastbound WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs (Milemarker 216-237) (through September 2018)
    Sand clean up and guardrail repairs
    ROAD ALERT: West: Idaho Springs
    Road Work
    MM239
    MM243
    I-70 Westbound Idaho Springs (Milemarker 239-243) (through July 2018)
    Rotomilling and Paving
    ROAD ALERT: East: East of Winter Park
    Road Work
    MM229
    MM234
    US 40 Eastbound / Westbound East of Winter Park (Milemarker 229-234) (through May 2018)
    Ditch cleaning, shoulder sweeping
    ROAD ALERT: East: on Rabbit Ears Pass
    Road Work
    MM232
    MM243
    US 40 Eastbound / Westbound on Rabbit Ears Pass (Milemarker 232-243) (through June 2018)
    Shoulder work
  • Idaho Springs-Genesee
    Dry
    2 hours ago
    No
    ROAD ALERT: East: Exit 240 West of Golden
    Road Work
    MM240
    MM240
    I-70 Eastbound Exit 240 West of Golden (Milemarker 240-240) (through July 2018)
    clean and jet and existing sewer system
    ROAD ALERT: East: in Golden
    Road Work
    MM240
    MM240
    I-70 Eastbound in Golden (Milemarker 240-240) (through August 2018)
    sewer repair
    ROAD ALERT: East: I-70, Veteran's Memorial Tunnel
    Road Work
    MM243
    MM242
    I-70 Eastbound / Westbound I-70, Veteran's Memorial Tunnel (Milemarker 243-242) (through June 2018)
    Tunnel inspection
    ROAD ALERT: West: Idaho Springs
    Road Work
    MM239
    MM243
    I-70 Westbound Idaho Springs (Milemarker 239-243) (through July 2018)
    Rotomilling and Paving
    ROAD ALERT: East: at the bottom of Floyd Hill
    Road Work
    MM244
    MM244.3
    I-70 Eastbound at the bottom of Floyd Hill (Milemarker 244-244.3) (through September 2018)
    Guardrail repair
    ROAD ALERT: East: Eastbound and westbound I-70 bridges over Soda Creek Road (MP 249); westbound I-70 bridge over Clear Creek (MP 244)
    Road Work
    MM243
    MM250
    I-70 Eastbound / Westbound Eastbound and westbound I-70 bridges over Soda Creek Road (MP 249); westbound I-70 bridge over Clear Creek (MP 244) (Milemarker 243-250) (through October 2018)
    The Colorado Department of Transportation and Structures Inc. will rehabilitate three bridges on Interstate 70 at mile points 244 and 249 this summer. In June, crews will begin preventative maintenance on the following structures: 1. Eastbound I-70 over Soda Creek Road (MP 249) in Jefferson County 2. Westbound I-70 over Soda Creek Road (MP 249) in Jefferson County 3. Westbound I-70 over Clear Creek (MP 244) in Clear Creek County Bridge work includes repairing the concrete decks, installing new waterproofing membranes, repairing bridge joints and placing new asphalt.
    ROAD ALERT: West: I70 WB 253.3-253.2 Chain up station
    Road Work
    MM253.3
    MM253.2
    I-70 Westbound I70 WB 253.3-253.2 Chain up station (Milemarker 253.3-253.2) (through April 2018)
    Guardrail repair
    ROAD ALERT: East: Site 1: I-70 near Genesee, Site 2: I-70 near Morrison Rd. Site 3: West side of I-70 and I-270 Interchange, and the east side of Quebec St. overpass, from MP 4.4 to MP 5.1
    Road Work
    MM252.7
    MM255.3
    I-70 Eastbound / Westbound Site 1: I-70 near Genesee, Site 2: I-70 near Morrison Rd. Site 3: West side of I-70 and I-270 Interchange, and the east side of Quebec St. overpass, from MP 4.4 to MP 5.1 (Milemarker 252.7-255.3) (through March 2019
    The goal of this $446,574 project is to improve the roadway safety in three sites in Jefferson County and Denver County, through the replacement and installation of median barrier, bringing the median safety measures up to current standards. These activities will cause WB and EB single-lane closures, and trucks and equipment entering and exiting I-70 traffic from the work zone.
    ROAD ALERT: East: I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path)
    Road Work
    MM241.2
    MM241.4
    US 40 Eastbound / Westbound I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path) (Milemarker 241.2-241.4) (through October 2018)
    Crews will install avalanche-control measures at: Loop Road slide path the above the Eisenhower/Johnson Memorial Tunnels; Batch Plant & Whistler slide paths west of EJMT on I-70; (north side); and Eighty slide path near Berthoud Pass on US 40.
    ROAD ALERT: East: on Rabbit Ears Pass
    Road Work
    MM232
    MM243
    US 40 Eastbound / Westbound on Rabbit Ears Pass (Milemarker 232-243) (through June 2018)
    Shoulder work
    ROAD ALERT: East: from Berthoud Falls to Empire
    Road Work
    MM249
    MM256
    US 40 Eastbound / Westbound from Berthoud Falls to Empire (Milemarker 249-256) (through June 2018)
    crack sealing
  • Genesee-C470
    Dry
    2 hours ago
    No
    ROAD ALERT: East: Site 1: I-70 near Genesee, Site 2: I-70 near Morrison Rd. Site 3: West side of I-70 and I-270 Interchange, and the east side of Quebec St. overpass, from MP 4.4 to MP 5.1
    Road Work
    MM252.7
    MM255.3
    I-70 Eastbound / Westbound Site 1: I-70 near Genesee, Site 2: I-70 near Morrison Rd. Site 3: West side of I-70 and I-270 Interchange, and the east side of Quebec St. overpass, from MP 4.4 to MP 5.1 (Milemarker 252.7-255.3) (through March 2019
    The goal of this $446,574 project is to improve the roadway safety in three sites in Jefferson County and Denver County, through the replacement and installation of median barrier, bringing the median safety measures up to current standards. These activities will cause WB and EB single-lane closures, and trucks and equipment entering and exiting I-70 traffic from the work zone.
    ROAD ALERT: East: Lookout Moutnain
    Road Work
    MM255.5
    MM255.5
    I-70 Eastbound Lookout Moutnain (Milemarker 255.5-255.5) (through May 2018)
    washout and guardrail repair
    ROAD ALERT: East: Mt. Vernon Canyon
    Road Work
    MM256.3
    MM256.3
    I-70 Eastbound Mt. Vernon Canyon (Milemarker 256.3-256.3) (through October 2018)
    Heaved concrete repair
    ROAD ALERT: East: between Mt. Vernon Exit and Morrison off-ramp
    Road Work
    MM257
    MM258
    I-70 Eastbound between Mt. Vernon Exit and Morrison off-ramp (Milemarker 257-258) (through June 2018)
    Culvert repair
    ROAD ALERT: East: from Berthoud Falls to Empire
    Road Work
    MM249
    MM256
    US 40 Eastbound / Westbound from Berthoud Falls to Empire (Milemarker 249-256) (through June 2018)
    crack sealing
  • Loveland Pass
    Wet In Areas
    2 hours ago
    No
    ROAD ALERT: West: I-70 and Bakerville
    Road Work
    MM222.5
    MM223.2
    I-70 Westbound I-70 and Bakerville (Milemarker 222.5-223.2) (through July 2018)
    VMS replacement
    ROAD ALERT: East: on I-70 from Eisenhower Memorial Tunnel to Silver Plume
    Road Work
    MM218
    MM226
    I-70 Eastbound / Westbound on I-70 from Eisenhower Memorial Tunnel to Silver Plume (Milemarker 218-226) (through June 2018)
    crack sealing
    ROAD ALERT: East: Between Glenwood Springs and New Castle
    Road Work
    MM221
    MM227
    I-70 Eastbound / Westbound Between Glenwood Springs and New Castle (Milemarker 221-227) (through December 2018)
    Bridge inspection
    ROAD ALERT: East: East of Winter Park
    Road Work
    MM229
    MM234
    US 40 Eastbound / Westbound East of Winter Park (Milemarker 229-234) (through May 2018)
    Ditch cleaning, shoulder sweeping
  • Granby-Winter Park
    Dry
    17 minutes ago
    No
    ROAD ALERT: East: Eisenhower-Johnson Memorial Tunnel South Bore
    Road Work
    MM215
    MM211
    I-70 Eastbound Eisenhower-Johnson Memorial Tunnel South Bore (Milemarker 215-211) (through November 2017)
    Work to repair barrier rail, walkway and handrail repairs
    ROAD ALERT: East: I-70 Eastbound ramp to southbound I-25
    Road Work
    MM213
    MM213
    I-70 Eastbound I-70 Eastbound ramp to southbound I-25 (Milemarker 213-213) (through October 2018)
    Concrete joint repair
    ROAD ALERT: East: I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path)
    Road Work
    MM213
    MM213.5
    I-70 Eastbound / Westbound I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path) (Milemarker 213-213.5) (through October 2018)
    Crews will install avalanche-control measures at: Loop Road slide path the above the Eisenhower/Johnson Memorial Tunnels; Batch Plant & Whistler slide paths west of EJMT on I-70; (north side); and Eighty slide path near Berthoud Pass on US 40.
    ROAD ALERT: North: I-25 north of 104th Ave
    Road Work
    MM221
    MM221
    I-70 Northbound I-25 north of 104th Ave (Milemarker 221-221) (through August 2018)
    Bridge repairs on pedestrian bridge
    ROAD ALERT: West: I-70 and Bakerville
    Road Work
    MM222.5
    MM223.2
    I-70 Westbound I-70 and Bakerville (Milemarker 222.5-223.2) (through July 2018)
    VMS replacement
    ROAD ALERT: East: on I-70 from Eisenhower Memorial Tunnel to Silver Plume
    Road Work
    MM218
    MM226
    I-70 Eastbound / Westbound on I-70 from Eisenhower Memorial Tunnel to Silver Plume (Milemarker 218-226) (through June 2018)
    crack sealing
    ROAD ALERT: East: Between Glenwood Springs and New Castle
    Road Work
    MM221
    MM227
    I-70 Eastbound / Westbound Between Glenwood Springs and New Castle (Milemarker 221-227) (through December 2018)
    Bridge inspection
    ROAD ALERT: West: WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs
    Road Work
    MM216
    MM237
    I-70 Westbound / Eastbound WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs (Milemarker 216-237) (through September 2018)
    Sand clean up and guardrail repairs
    ROAD ALERT: North: in Denver Metro Area
    Road Work
    MM213
    MM260
    I-70 Northbound / Southbound in Denver Metro Area (Milemarker 213-260) (through June 2018)
    Install pavement markings on various highways regionwide
    ROAD ALERT: East: Near Granby
    Road Work
    MM219
    MM212
    US 40 Eastbound / Westbound Near Granby (Milemarker 219-212) (through September 2018)
    Machine Patching
    ROAD ALERT: East: East of Winter Park
    Road Work
    MM229
    MM234
    US 40 Eastbound / Westbound East of Winter Park (Milemarker 229-234) (through May 2018)
    Ditch cleaning, shoulder sweeping
  • I-70 to Winter Park (Berthoud Pass)
    Wet In Areas
    2 hours ago
    No
    ROAD ALERT: West: WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs
    Road Work
    MM216
    MM237
    I-70 Westbound / Eastbound WB and EB I-70 from Junction US-6 Loveland Pass to Idaho Springs (Milemarker 216-237) (through September 2018)
    Sand clean up and guardrail repairs
    ROAD ALERT: East: Exit 240 West of Golden
    Road Work
    MM240
    MM240
    I-70 Eastbound Exit 240 West of Golden (Milemarker 240-240) (through July 2018)
    clean and jet and existing sewer system
    ROAD ALERT: East: in Golden
    Road Work
    MM240
    MM240
    I-70 Eastbound in Golden (Milemarker 240-240) (through August 2018)
    sewer repair
    ROAD ALERT: East: I-70, Veteran's Memorial Tunnel
    Road Work
    MM243
    MM242
    I-70 Eastbound / Westbound I-70, Veteran's Memorial Tunnel (Milemarker 243-242) (through June 2018)
    Tunnel inspection
    ROAD ALERT: West: Idaho Springs
    Road Work
    MM239
    MM243
    I-70 Westbound Idaho Springs (Milemarker 239-243) (through July 2018)
    Rotomilling and Paving
    ROAD ALERT: East: at the bottom of Floyd Hill
    Road Work
    MM244
    MM244.3
    I-70 Eastbound at the bottom of Floyd Hill (Milemarker 244-244.3) (through September 2018)
    Guardrail repair
    ROAD ALERT: East: Eastbound and westbound I-70 bridges over Soda Creek Road (MP 249); westbound I-70 bridge over Clear Creek (MP 244)
    Road Work
    MM243
    MM250
    I-70 Eastbound / Westbound Eastbound and westbound I-70 bridges over Soda Creek Road (MP 249); westbound I-70 bridge over Clear Creek (MP 244) (Milemarker 243-250) (through October 2018)
    The Colorado Department of Transportation and Structures Inc. will rehabilitate three bridges on Interstate 70 at mile points 244 and 249 this summer. In June, crews will begin preventative maintenance on the following structures: 1. Eastbound I-70 over Soda Creek Road (MP 249) in Jefferson County 2. Westbound I-70 over Soda Creek Road (MP 249) in Jefferson County 3. Westbound I-70 over Clear Creek (MP 244) in Clear Creek County Bridge work includes repairing the concrete decks, installing new waterproofing membranes, repairing bridge joints and placing new asphalt.
    ROAD ALERT: West: I70 WB 253.3-253.2 Chain up station
    Road Work
    MM253.3
    MM253.2
    I-70 Westbound I70 WB 253.3-253.2 Chain up station (Milemarker 253.3-253.2) (through April 2018)
    Guardrail repair
    ROAD ALERT: East: Site 1: I-70 near Genesee, Site 2: I-70 near Morrison Rd. Site 3: West side of I-70 and I-270 Interchange, and the east side of Quebec St. overpass, from MP 4.4 to MP 5.1
    Road Work
    MM252.7
    MM255.3
    I-70 Eastbound / Westbound Site 1: I-70 near Genesee, Site 2: I-70 near Morrison Rd. Site 3: West side of I-70 and I-270 Interchange, and the east side of Quebec St. overpass, from MP 4.4 to MP 5.1 (Milemarker 252.7-255.3) (through March 2019
    The goal of this $446,574 project is to improve the roadway safety in three sites in Jefferson County and Denver County, through the replacement and installation of median barrier, bringing the median safety measures up to current standards. These activities will cause WB and EB single-lane closures, and trucks and equipment entering and exiting I-70 traffic from the work zone.
    ROAD ALERT: East: Lookout Moutnain
    Road Work
    MM255.5
    MM255.5
    I-70 Eastbound Lookout Moutnain (Milemarker 255.5-255.5) (through May 2018)
    washout and guardrail repair
    ROAD ALERT: East: Mt. Vernon Canyon
    Road Work
    MM256.3
    MM256.3
    I-70 Eastbound Mt. Vernon Canyon (Milemarker 256.3-256.3) (through October 2018)
    Heaved concrete repair
    ROAD ALERT: East: between Mt. Vernon Exit and Morrison off-ramp
    Road Work
    MM257
    MM258
    I-70 Eastbound between Mt. Vernon Exit and Morrison off-ramp (Milemarker 257-258) (through June 2018)
    Culvert repair
    ROAD ALERT: East: East of Winter Park
    Road Work
    MM229
    MM234
    US 40 Eastbound / Westbound East of Winter Park (Milemarker 229-234) (through May 2018)
    Ditch cleaning, shoulder sweeping
    ROAD ALERT: East: I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path)
    Road Work
    MM241.2
    MM241.4
    US 40 Eastbound / Westbound I-70 near EJM Tunnel (3 slide locations) and US 40 Berthoud Pass (1 slide path) (Milemarker 241.2-241.4) (through October 2018)
    Crews will install avalanche-control measures at: Loop Road slide path the above the Eisenhower/Johnson Memorial Tunnels; Batch Plant & Whistler slide paths west of EJMT on I-70; (north side); and Eighty slide path near Berthoud Pass on US 40.
    ROAD ALERT: East: on Rabbit Ears Pass
    Road Work
    MM232
    MM243
    US 40 Eastbound / Westbound on Rabbit Ears Pass (Milemarker 232-243) (through June 2018)
    Shoulder work
    ROAD ALERT: East: from Berthoud Falls to Empire
    Road Work
    MM249
    MM256
    US 40 Eastbound / Westbound from Berthoud Falls to Empire (Milemarker 249-256) (through June 2018)
    crack sealing